BM> Good on the severance package and relaxing; COVID has put a crimp in
BM> some of the plans here too but dealt with the situation. ...My GMail
BM> account has reported for several months in a row the highlight of my
BM> travels is to the grocery store!!
My travel history is similar. Building up a history on GrubHub too...
BM> We need to replace the deck here; holding off because of the price of
BM> lumber has skyrocketed. Replaced a couple of boards/sections for the
BM> time-being. (Did that little job ourselves.) Considering composite
BM> but first need a contractor: two (three?) interviewed and besides the
I would have liked to have used composite, but that is expensive compared to
wood. I really need to get out and stain it. As winter is starting to set
it, that will be a next summer job.
--- Mystic BBS v1.12 A46 2020/08/26 (Linux/64)
* Origin: LostCause Halfway House (454:3/118)
|